WIND TURBINES X 5 INSTALLED

Projects: Realisations

electrawinds_powered-nature

Bruges I – Five 600kW wind turbines – November 2000


The first Electrawinds project was the construction of a windmill farm along the Boudewijn Canal in Bruges. Five Turbowinds T-600 turbines were installed with a nominal capacity of 600kW. This project was carried out in November 2000.


Sourced and published by Henry Sapiecha 18th July 2009